Procedure Departure
May 31
We begin
by flying to Islamabad via London, thereafter we
continue to fly to Skardu. From here it takes one
day by truck/jeep to the stone age village of
Askole at 3 000m above sea level.
|
|
Basecamp
We will be bringing along 1.5 tons
of equipement which is carried in by local carriers to
the basecamp at 5 200m. We are counting on arriving to
the basecamp June 21st. When the equipement is in place
the carriers will return, to later return 7 weeks later.
When
the basecamp is built we will begin
acclimatisation, so the body can get used to the
heights. This will occur during practice climbs
of lower peaks in the nearby area, along with
exploration of the mountains northwest wall which
is the path/road we had thought of taking to the
top. During the exploration tours difficult
passages are secured and a couple of higher
basecamps will be set-up.
More about the expeditions
equipement... |
|
Attempt
to reach the peak
If health and the forces of weather
are on our side we can make our first attempt for the top
during the last week of July. Since we are
attempting to climb without oxygen or carriers we
anticipate that it will take apx. 5-6 days to reach the
top from the basecamp and back. During the second week of
august it will time to tear down basecamp and head home.
Time schedule
Approximated time schedule
for completion of the project:
- Departure from Sweden
May 31st
- Trekking begins June
6th
- Arrival to basecamp
June 20th
- Acclimatisation,
set-up higher camps June 23rd (C1)
- First attempt to
reach the top July 20th
- August 2nd - Arrive
home
See
"maps" for more information...
Latest News Log-book Weather Maps Description Procedure
Participants Trekking Gruope Himalaya Pakistan Hidden Peak Gallery
Equipement Sponsors Links Press Clippings Other
Contact Us Back home...
Web Design and
internet provider - Teknikhuset i Umeå, Sweden
© Copyright 1997 Svenska Hidden Peak Expeditionen 1997
All rights reserved
|